Mike and Jerry located and repaired a broken drain line in the lower elementary. The cabinets were removed. The carpet was pulled up. A hole was cut in the wall and in the cement floor. A drain pipe was repaired and the classroom put back to normal - all in three days. New caulk is the only visible sign that anything was done.
|